• Nederlands
  • Français
+31 (0)168 32 35 00 info@cci-bv.nl

8 km cemented steel pipelines and bends DN800 for L’autoroute de l’eau in Wallonia

Client
SWDE
Contractor
Samenwerking tussen DENYS – TEGEC - Hydrogaz
Additional details
DN800 Ø813 x 6.3 L18m Uitvoering : spie-mof

For L’autoroute de l’eau in Wallonia (Villers-le-Bouillet), about 8 km of cemented steel pipelines and bends DN800 were supplied.

Pipes DN800 Ø813 × 6.3, 18 m long, spigot-socket execution. Client: SWDE; contractors: Denys – TEGEC – Hydrogaz.

© Copyright CCI leidingsystemen b.v.