To enable the enlargement of the highway A27 between Houten and junction Hooipolder, multiple adjustments where needed.
Amongst others a part of the water transport pipeline of drinking water company Oasen had to be diverted.
4 drillings where needed for the new water pipeline, near Meerkerk: drillings with a length of circa 1.100 meter and one drilling of approximately 2.200 meter.
CCI Leidingsystemen was able to deliver the pipelines, curves and flanges for his beautiful project.