From CCI Leidingsystemen we were able to make an important contribution to the Biesbosch Zuid project, section K2 – K4.
This concerns a pipeline of about 10 kilometres; the pipes are 16 metres long and weigh 11 tonnes each.
In addition to the straight lengths, matching spool pieces were supplied. Dimensions: DN1400 × 14.2 to 20 mm. Client: Evides; contractor: VSH.