• Nederlands
  • Français
+31 (0)168 32 35 00 info@cci-bv.nl

Relocation of BAL-1 pipeline for the Westergouwe plan

Client
Dunea
Contractor
Van der Ven
Additional details
32 meter lange zinker in DN1400

For the Westergouwe plan near Gouda, the BAL-1 pipeline had to be relocated.

CCI contributed a 32-metre-long DN1400 siphon. Client: Dunea; contractor: Van der Ven.

© Copyright CCI leidingsystemen b.v.